您所描述的並不會產生相同的結果。或許可以表述為「與基礎專案的差異」。
但 Paratext 中的按鈕(其運作方式與回譯專案中的按鈕完全相同)會開啟歷史記錄,並將基礎專案設定為兩個不同的日期。一個日期是您首次在子專案(或 BT 專案)中將方框標記為「已檢查」的時間,另一個日期則是目前的時間。因此,您可以查看在這些時間段之間基礎專案中發生的所有變更。
但根據回覆,我想您已確認 PT Lite 驗證 PT Lite 並未內建此功能。感謝您的回覆。
What you describe doesn't do the same thing. It might be stated as "Differences to base project".
But the button in Paratext (which works exactly like the button in Back Translation projects) opens the history with the base project set to two different dates. One date is when you first marked box in the Daughter (or BT) project as "checked" and the second date is the current one. So you can see everything that changed in the base project between those periods of time.
But based on the answer I think you verified that PT Lite doesn't have that functionality built it. Thank you for the response.
機器翻譯自 English