I have a remote team member, who now can’t continue working on our project, since I attached the new compact plan, because her computer refused to update PT8 (a recent update had obviously not stuck). Automatic Updates was turned on. Check for Updates manually didn’t work, even when online. Applying the latest available patch manually ended “prematurely because of an error” (no error specified). Windows 10 was up to date. No antivirus software was installed. Whenever PT8 was opened, it prompted to install an update it downloaded, 27ab96.msi, but then didn’t do it when okayed. PT was hung on version 100.75. Deleting the compact plan from the project didn’t t solve the problem, send/receive for the project was permanently disabled by PT8 for that project on that computer. Deleting the project and redoing the whole download after deleting the compact plan did not unblock the project, because “the project version was upgraded” with that fatal send/receive that declared the PT8 version insufficient for the compact plan. It seems, the project was not downgraded back again when the compact plan was deleted. Installing the PT update patch from the command line also failed. In the end, PT8 needed to be uninstalled and reinstalled completely. That restored access to the project, but the work of the previous day (when s/r declared the project no longer compatible) was still lost.

舊文章 - 以原文顯示
Paratext 由 (255 點) 提出
已重新顯示 | 249 次瀏覽

2 個回答

0 票
最佳回答

I can often get around the PT8 failure to update by opening an “admin” console (dos shell), and running the patch from the shell. AFAIK, it is the only way to run a PT8 patch at a forced admin level.

舊文章 - 以原文顯示
由 (1.2k 點) 提出
已重新顯示

By admin console, you mean Command Prompt,
run as Administrator? Is that what you mean by DOS Shell? Then
maybe that is what went wrong when we tried it from the Command
Prompt: we didn’t run it as administrator. When we reinstalled
PT, that’s what we did, run it as admin… OK, that explains it.
Thanks. That’s good to know for next time.

舊文章 - 以原文顯示
0 票

correct.

舊文章 - 以原文顯示
由 (1.2k 點) 提出

相關問題

0 票
3 個回答 347 次瀏覽
From what PT8 Linux version is it possible to use the SIL Compact Plan? Thanks.
Sara 246 提出 已提問 6月 4, 2020
0 票
7 個回答 748 次瀏覽
I appreciate the simpler Project Plan that SIL has created. I now have the file: C:\My Paratext 8 ... the SIL Compact Plan. What silly thing have I neglected?
jeffh 1.4k 提出 已提問 6月 19, 2019
0 票
1 個回答 259 次瀏覽
Today, I applied a modified Compact Project Plan to a Project using PT8, it warned that all other project users must ... their ability to view or interact with the plan? Thanks
listentwice 1.2k 提出 已提問 10月 14, 2019
0 票
2 個回答 340 次瀏覽
Last day of a PT8 Migration workshop. We needed to delete the User1 PT8 account. After we made User 2 admin on ... redo the migration, but I would rather not. Thanks, listentwice
listentwice 1.2k 提出 已提問 11月 10, 2017
0 票
2 個回答 227 次瀏覽
是否可以直接從 My Paratext 9 Projects 資料夾中刪除專案資料夾來快速刪除專案,而不必在 Paratext 中逐一開啟並刪除? 我只想把它們從我的電腦上移除,不需要在 Registry 或 S/R 伺服器上對它們做任何操作。 謝謝, james_post
[Moderator]
james_post
2.1k 提出
已提問 6月 17, 2022
Welcome to Support Bible, where you can ask questions and receive answers from other members of the community.
Accept the one whose faith is weak, without quarreling over disputable matters.
Romans 14:1
3,051 個問題
6,010 個回答
5,676 則評論
2,030 位使用者