1 Click Manage Plans to see the stages and tasks in your project plan or to copy tasks from another project plan.

2 Click Add Stage to add a stage.
The new stage follows the active stage.

3 Click Add Task to add a task.
The new task is added immediately following the highlighted stage or task.

4 Select the language for the name and description of the added item.

5 Enter a name for the added item.

6 Enter a description for the added item.

7 Do one of the following to remove a task or stage:

  • Select a task and click Remove Task.
  • Select a stage and click Remove Stage.

If you add a task in guide step 3 above, do steps 8 , 9 , and 10 .
8 From the “Mark task as complete” drop-down, select one of the following:

  • Once for entire book (for a book task)
  • Once for each chapter (for a chapter task)
  • Once for entire project (for a project task)
    :checkicon: If you select the "Once for entire project" option, there are default options which you cannot change for steps 9 and 10 below. Skip to the paragraph following the two bullets in step 10.

9 From the “When can this task start?” drop-down, select an option to specify when (relative to other work) the task can begin.

10 From the “Requires Editing” drop-down, select one of the following for project XYZ:

  • No (if the result of the task will not require the text to be edited. For example, a task to make sure you have copyright permission to use the figures you want to include with your text.)
  • Scripture Text (XYZ) (if the result of the task will require the text to be edited)

To finish creating or modifying the project plan, click the Checks tab and, from the drop-down list for each check, select the earliest stage where you want the check to be run. The check will automatically be done in all following stages.
***** If the project is not registered this item is gray. You must register the project in order to be able to use the Interlinearizer.

11 Click OK when you have finished creating or modifying your project plan.

舊文章 - 以原文顯示
Paratext [Expert]
(735 點) 提出

已重新顯示 | 148 次瀏覽

登入註冊 以回答此問題。

相關問題

0
0 個回答 166 次瀏覽
The expected rate of progress values for the plan and task you select in guide steps 1 and 2 will replace the expected ... Project Plan dialog. 4 Click OK when you are finished.
[Expert]
anon421222
735 提出
已提問 2月 23, 2017
0
0 個回答 187 次瀏覽
關於研讀本聖經的問題: Paratext 9 是否有像 Paratext 7.3 那樣的研讀本聖經編寫指南? 是否已有可供選擇的研讀本聖經內容,讓使用者可以改編並翻譯,以便納入側欄等位置?還是每個人都得重新發明輪子? 在 ... 是否有顧問可用於檢查研讀本聖經內容,還是這個 Paratext 功能會讓使用者陷入物流上的死胡同?) 謝謝, RickNivens
RickNivens 264 提出 已提問 7月 5, 2022
0
0 個回答 174 次瀏覽
In the window of the project that has the expected rate of progress you want to replace, click to make it ... that will overwrite the values already present for the selected task.
[Expert]
anon421222
735 提出
已提問 2月 23, 2017
0
0 個回答 129 次瀏覽
1 Select the range of glossed text you wish to export. 2 Click this button to select the project you wish to export the ... XYZ is the project selected in step 2). 3 Click Export.
[Expert]
anon421222
735 提出
已提問 2月 23, 2017
0
1 個回答 96 次瀏覽
我收到一位使用者提出的問題 歡迎大家提出想法或建議: 有沒有辦法儲存現有的專案計畫,以確保經節歷史(工作進度)不會被刪除,並從基礎計畫建立新的專案計畫?我希望不要遺失經節歷史 或者,我是否應該直接修改目前的計畫,為各階段添加 ... 和創世記,並開始翻譯其他舊約書卷 多年前在進階 Paratext 培訓課程中設定的專案計畫,並沒有包含任何已描述的階段或任務
[Moderator]
james_post
2.1k 提出
已提問 11月 7, 2024
Welcome to Support Bible, where you can ask questions and receive answers from other members of the community.
Make every effort to keep the unity of the Spirit through the bond of peace.
Ephesians 4:3
3,049 個問題
6,007 個回答
5,672 則評論
2,029 位使用者